Roadrunner

Cabling and Cabinet Prep

March 2008 IBM Poughkeepsie


A-Cable labeling in POK.jpg

B-Cable labeling in POK 2.jpg

C-Cable labeling in POK 3.jpg

D-Cable unrolling.jpg

E-Cable bundling 2.jpg

F-Cable bundling.jpg

G-Cable labelled and waiting.jpg

H-Cables ready to go.jpg

I-2nd Stage Switch Racks in place.jpg

J-2nd Stage Switch Racks - partial cabling.jpg

K-2nd Stage Switch Racks front 2.jpg

K-2nd Stage Switch Racks front.jpg

L-2nd Stage Switch Racks rear.jpg

M-Underfloor cable installation.jpg

N-Underfloor cable installation 2.jpg

O-Floor plan verification.jpg

P-Ethernet ready for next CU.jpg

Q-Racks ready for cables.jpg

R-Cable sorting.jpg